The Coppermills reservoir network sits within the Lee Valley Special Protection Area, an important habitat for resident and migratory birds. It supplies Coppermills Water Treatment Works in Walthamstow, a major source of drinking water for London.
MMP delivered a combined commercial diving and confined space project to replace an ageing cast-iron gate valve inside the reservoir inlet tower and install a new external penstock. The works needed specialist access, underwater preparation and close coordination between the diving, surface and confined space teams.
Specialist access and underwater installation
To support the works, MMP fabricated a bespoke 8m x 8m, 2-tonne A-frame and installed it on a floating pontoon platform spanning the reservoir tower.
MMP divers surveyed the structure, cleaned the working area and used Broco underwater cutting equipment to remove the protruding section of the existing cast-iron pipe. The team then installed and commissioned the external penstock and control spindle, giving a primary means of isolating the tower interior from the reservoir.
Internal valve replacement
With the primary isolation in place, MMP carried out a high-risk confined space entry into the tower, supported by a dedicated confined space rescue team. The existing valve was removed and replaced with a new flange adaptor and a powder-coated stainless steel gate valve.
Working closely with the valve manufacturer, MMP also developed and installed an offset spindle assembly so the valve can be operated from the surface. The new valve and operating arrangement were successfully commissioned.
Project outcome
The completed works improved the reservoir’s isolation arrangements, giving the client the ability to double-isolate the inlet system for future access during tunnel maintenance and cleaning.
MMP’s mix of diving, confined space and fabrication capabilities meant practical challenges could be solved with the client as the work progressed. After the valve installation, MMP also designed, fabricated and installed new GSM flooring to improve access within the tower.
Services provided
Commercial diving and underwater surveys
High-risk confined space entry and dedicated rescue support
Floating pontoon platform and bespoke A-frame
Underwater cleaning and Broco cutting
External penstock and control spindle installation
Internal gate valve and flange adaptor replacement
Offset spindle assembly design and installation
GSM flooring design, fabrication and installation