As part of the AMP8 works at Queen Mary Reservoir, MMP’s commercial diving team installed seven isolation plates inside the reservoir tower at a water depth of 16 metres.
Pontoon lifting and underwater installation
Using a pontoon-mounted A-frame, the surface team lowered each plate to the divers, who positioned it precisely over its opening. The divers then used specialist underwater tooling, including hydraulic drilling equipment, to secure each plate in place.
Careful planning and close coordination between the surface and diving teams kept every lift controlled and the installation safe throughout.
Solving an unexpected problem on site
During the works, the team found an existing valve that was letting water pass through and needed to be removed. MMP worked closely with the client to assess the problem and adapt the installation sequence, resolving the issue while keeping the programme on track.
Project outcome
All seven isolation plates were successfully installed. The project shows how MMP combines specialist diving with practical problem-solving and a responsive approach when site conditions change.
Services provided
Commercial diving at 16 metres
Underwater isolation plate installation
Pontoon-mounted A-frame lifting operations
Hydraulic underwater drilling
Valve assessment and removal
Read more about our underwater inspection work, or contact us or call 01992 618055 to discuss your reservoir project.